Domain: tiger-web1.srvr.media3.us New Construction Update Alex Box | Tiger Rant
Page 1
Page 1
Started By
Message
locked post

New Construction Update Alex Box

Posted on 1/21/09 at 8:03 am
Posted by Malaysian Tiger
Manila
Member since May 2008
4732 posts
Posted on 1/21/09 at 8:03 am
Posted by JustSmokin
Member since Sep 2007
9162 posts
Posted on 1/21/09 at 8:06 am to
It'll never be ready.
Posted by Brinner
Retirement home
Member since May 2008
2656 posts
Posted on 1/21/09 at 8:09 am to
OMG this is like so totally germans. WTF TTYL
Posted by BackWoodsTiger
Member since Sep 2008
6148 posts
Posted on 1/21/09 at 8:13 am to
We need to get this stickied. We get a new thread everytime somebody drives by. Thanks for the info but it's like every ten min.
Posted by SECBengal
Purple and Gold
Member since Oct 2007
3010 posts
Posted on 1/21/09 at 8:15 am to
It looks better than it did last week. Still a long way to go.
I'm glad that the Athletic Department is sending the updates out every week, with pictures.

Posted by Malaysian Tiger
Manila
Member since May 2008
4732 posts
Posted on 1/21/09 at 10:41 am to
These updates only come out once a week so you cannot have a thread every 10 minutes. I am not asking whether it will be completed or not just that new pictures are available to view. I agree with the other poster in that some things look a lot better especially the Locker Room.
Posted by ligerbait
Nashville, TN
Member since Dec 2005
3125 posts
Posted on 1/21/09 at 12:01 pm to
quote:

These updates only come out once a week so you cannot have a thread every 10 minutes.


You can if people keep posting the same day-old link
Posted by tss22h8
30.4 N 90.9 W
Member since Jan 2007
18791 posts
Posted on 1/21/09 at 1:11 pm to
I went by there during lunch. They were pouring concrete in the front and the parking lot on the 3rd base side has been blacktopped. Somebody on here asked about outfield bleachers; I couldn't see well enough from the street to know if they've been installed.
Posted by BackWoodsTiger
Member since Sep 2008
6148 posts
Posted on 1/21/09 at 1:24 pm to
quote:

You can if people keep posting the same day-old link
Thank you.
Posted by BackWoodsTiger
Member since Sep 2008
6148 posts
Posted on 1/21/09 at 1:30 pm to
Im not trying to be a jerk malaysiantiger but for real...search Alex BOx on the rant and you'll see..halfway down the page I saw that update posted three different times yesterday. And that the lights were on at night but please hit that search button daddy-o.
Posted by MileBranchTiger
Member since Nov 2005
146 posts
Posted on 1/21/09 at 1:36 pm to
quote:

They were pouring concrete in the front and the parking lot on the 3rd base side has been blacktopped.

The looks will really show big improvement when you can see concrete and paved parking lots.
Posted by Chittlins
United States
Member since Feb 2008
27 posts
Posted on 1/21/09 at 2:55 pm to
Can't believe your new stadium still will not be as good as Baum at the UofA
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96897 posts
Posted on 1/21/09 at 2:57 pm to
why is that?
Posted by lsu2006
BR
Member since Feb 2004
40106 posts
Posted on 1/21/09 at 2:58 pm to
:itwillneverbeready:
Posted by NoBama
Baton Rouge
Member since Oct 2008
678 posts
Posted on 1/21/09 at 3:27 pm to
Wow what a surprise. LSU is great at promising things will be done and ready then not fullfilling them. I sure hope they saved Labor Costs though.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram