re: Everyone Hates Data Centers it is almost universal

Posted on 2/25/26 at 7:03 pm to
Posted by chalmetteowl
Chalmette
Member since Jan 2008
54262 posts
Posted on 2/25/26 at 7:03 pm to
quote:

It's seems most people in here are Ok with China winning the AI race. Which will also mean the destruction of the USA.


I’m 40. It won’t happen in my lifetime
Posted by Shorts Guy
BR
Member since Dec 2023
621 posts
Posted on 2/25/26 at 8:10 pm to
They really need to figure out the water situation. Supposedly the one coming in West Fel will have some kind of closed-loop system where all the water is re-used. Keep me honest if I’m remembering that wrong. But makes me wonder why they all aren’t doing that. Just cheaping out or what? Seems like all the money spent on PR could be spent on that.

Then there’s the power challenges. Oy vey. I want to be supportive but there are so many issues.
Posted by Turnblad85
Member since Sep 2022
5043 posts
Posted on 2/25/26 at 8:52 pm to
quote:

I’m 40. It won’t happen in my lifetime


especially if you keep sucking down those diet cokes
Posted by chalmetteowl
Chalmette
Member since Jan 2008
54262 posts
Posted on 2/25/26 at 9:09 pm to
quote:

especially if you keep sucking down those diet cokes


Tf I drink the real thing
Posted by moncouer
Member since Feb 2026
16 posts
Posted on 2/25/26 at 10:40 pm to
(no message)
This post was edited on 2/26/26 at 8:05 am
Posted by Bruco
Charlotte, NC
Member since Aug 2016
3021 posts
Posted on 2/26/26 at 7:56 am to
quote:

They really need to figure out the water situation. Supposedly the one coming in West Fel will have some kind of closed-loop system where all the water is re-used. Keep me honest if I’m remembering that wrong. But makes me wonder why they all aren’t doing that. Just cheaping out or what? Seems like all the money spent on PR could be spent on that.


Like anything it’s evolving and improving tech. I’d be surprised if any projects breaking ground now aren’t using a closed loop system.

I believe retro fitting is possible but no idea on the cost.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
77390 posts
Posted on 2/26/26 at 8:02 am to
quote:

They really need to figure out the water situation. Supposedly the one coming in West Fel will


The paper mill is/was much much worse than what the data center will likely be.

quote:

Then there’s the power challenges.


Remember that the life span is 30 years. Even the Meta data center will likely be commissioned at probably 10% capacity and it will take years for full capacity, if ever.
Posted by Jake88
Member since Apr 2005
79165 posts
Posted on 2/26/26 at 10:53 pm to
quote:


It’s insane how almost overnight many human just decided to 100 percent give up their own research and reasoning and let a computer think for them
Luckily I know maybe 2 people like this.
Posted by Jake88
Member since Apr 2005
79165 posts
Posted on 2/26/26 at 10:55 pm to
quote:


especially if you keep sucking down those diet cokes
What does Diet Coke do?
Posted by 225Tyga
Member since Oct 2013
19598 posts
Posted on 2/26/26 at 11:38 pm to
quote:

I track metro Atlanta data center construction as part of my Business Development job. There have been about 90 DC projects in metro over the last 6 years. QTS is currently building out a mega campus on the Southside. Sixteen separate DC buildings that average about 300k sf per. That is one campus. Switch is building one in Cartersville about the same size. DC developers currently building in Atlanta include: Microsoft AWS (Amazon Web Services) Meta DC Blox T5 Data Centers Google Switch QTS DataBank Edgeconnex Stream DC Every one of those have 1 or more campuses with current construction. AWS has two huge campuses being developed. One in Covington and one about to start in Douglasville. Microsoft is about to start its 3rd campus in East Point. Atlanta metro has an absurd amount of DCs.


This is 100% accurate.


And who the hell os building all these DCs that’s a lot of SQFT
Posted by highcotton2
Alabama
Member since Feb 2010
10444 posts
Posted on 2/27/26 at 6:58 am to
quote:

Now he's hearing that some of the data center people are starting to offer north of 10k for water rights and power easements.


Solar farms are offering $23,000 ac in my area right now for farmland. 1000ac tracts. They will also do $1200 ac rents for 20 years percentage increase every year.
Page 1 2 3 4 5 6
Jump to page
first pageprev pagePage 6 of 6Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram