- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Keystone XL pipeline
Posted on 3/6/26 at 8:02 am
Posted on 3/6/26 at 8:02 am
Why hasn't this project been resumed now that the retarded jackass who revoked the permits is out of office?
Posted on 3/6/26 at 8:06 am to ManBearTiger
quote:
AI Overview
The Keystone XL pipeline project was terminated by TC Energy in June 2021 after President Biden revoked its key permit. While the existing Keystone System remains operational, the expansion project is dormant, with the company stating in 2023 it is no longer an opportunity, despite political pledges to revive it.
Key Details on the Status of the Keystone Pipeline:
Keystone XL Cancellation: Following the revocation of its cross-border permit on President Biden's first day in office, developer TC Energy officially terminated the project on June 9, 2021.
Asset Ownership & Future: The project was officially abandoned, with South Bow—a company spun off from TC Energy—now managing the existing pipeline system.
Political Context: Despite President Trump's campaign pledges to "allow the Keystone pipeline" and authorize its construction, the company had previously indicated it had "moved on" from the project.
Obstacles to Revival: Reviving the project is complicated by dismantled infrastructure, sold materials, and the need for new, lengthy environmental and local approval processes.
Existing System Safety: The operating Keystone Pipeline has faced recent issues, including a significant oil leak in North Dakota in April 2025, leading to a shutdown and subsequent repair by South Bow.
Posted on 3/6/26 at 8:11 am to ManBearTiger
Because TC Energy said "screw it" and cut their losses after all the back and forth over the years, and other pipelines that didn't draw red meat attention basically helped take its place.
While the enviro-commies were focused solely on Keystone XL, other legs to add to that overall flow were being approved and constructed.
The specific "XL" project of that network is no longer worth the investment in capital to construct, even if it were approved by Noon today and somehow couldn't be revoked during the construction and commission phase.
While the enviro-commies were focused solely on Keystone XL, other legs to add to that overall flow were being approved and constructed.
The specific "XL" project of that network is no longer worth the investment in capital to construct, even if it were approved by Noon today and somehow couldn't be revoked during the construction and commission phase.
This post was edited on 3/6/26 at 8:14 am
Posted on 3/6/26 at 8:12 am to ManBearTiger
My guess is they are afraid of getting burned again. If Vance loses in 28 and a communist gets in and revokes their permit again they would get doubly screwed.
Honestly any Trump revocations on regulations and permitting is nice but not as big as people think. Companies don’t act bc they know a Dem will just put them right back in.
Honestly any Trump revocations on regulations and permitting is nice but not as big as people think. Companies don’t act bc they know a Dem will just put them right back in.
Posted on 3/6/26 at 8:16 am to ManBearTiger
quote:
Why hasn't this project been resumed
It's a right wing political slogan. The company that proposed it moved on years ago. If republicans want it built, they can build it.
This post was edited on 3/6/26 at 8:17 am
Posted on 3/6/26 at 8:19 am to ragincajun03
quote:
other legs to add to that overall flow were being approved and constructed.
Exactly. There is no "pipeline gap" that needs to be filled. Other lines were constructed to fill whatever need there was.
Posted on 3/6/26 at 8:26 am to ManBearTiger
The 1.2 million BPD Capline was reversed. The only thing keeping from being reversed was condensate, aka Eagle Ford, being sent from Corpus via ship to LOOP then pipelined to Canada to use as diluent for produced Canadian very heavy crude. When the Monteney wet natural gas was tapped in Canada, it produced enough condensate to no longer need imported from the USA.
Now with Venezuelan, Canadian is almost not needed along the Gulf Coast.
FWIW, the only reason that Keystone was built was unreliability of delivery of Venezuelan crude. Keystone XL was proposed and begun for the same reason.
Now with Venezuelan, Canadian is almost not needed along the Gulf Coast.
FWIW, the only reason that Keystone was built was unreliability of delivery of Venezuelan crude. Keystone XL was proposed and begun for the same reason.
Posted on 3/6/26 at 9:31 am to CitizenK
Green peace has a 400 million dollar legal settlement against them for f-cking with the pipeline. Pipeline company does not want to lose that by return to service talk. Green peace probably will go bankrupt and not pay anyway
Posted on 3/6/26 at 9:46 am to Trevaylin
quote:
Green peace has a 400 million dollar legal settlement against them for f-cking with the pipeline. Pipeline company does not want to lose that by return to service talk. Green peace probably will go bankrupt and not pay anyway
That lawsuit was brought by Energy Transfer and is in regards to Greenpeace interfering with with their construction and operations of the Dakota Access Pipeline, which is in operation.
Keystone XL was a project by TC Energy.
Two different pipelines. The lawsuit isn't about Keystone XL. If TC Energy should sue anyone for their losses on KXL, it should be the Federal Government. But...you never know if such a lawsuit would prevent other projects on Federal Lands from being approved until litigation is resolved.
This post was edited on 3/6/26 at 9:48 am